Blog

Latest Articles Tagged ‘Case Study’

Permalite® Aluminium Products Perform Swimmingly In Aquatic Centre Redevelopment

With redevelopment of the Auburn Ruth Everuss Aquatic Centre requiring demolition of all existing pools and construction of entirely new structures for six pools (an outdoor 50m pool, outdoor water polo pool and shaded outdoor children's splash pad, plus an air-conditioned indoor pool, indoor family leisure pool and indoor program pool), the project presented a substantial task for NBRS Architecture and Cockram Construction.